Main Hull together, bulkheads going in

During our last visit to the Lightwave Factory just before the Australia Day weekend, we got to see completed hull with the hull-sides in place.  Things have progressed further since our visit with the mast bulkhead installed and the many furniture mouldings starting to be installed.

Lightwave have been getting a bit of press lately in the Multihull World Magazine.  There is a great article in the latest edition about Lightwave Yachts.

MHW2014_article

MW_2014_1029_6549

IMG_4041
Main mould from the front (with Naomi and Eli)
IMG_4032
Naomi and Eli standing at the back.
IMG_4013
Geoff, Naomi and Eli standing about where the port-side cabin will go.
IMG_4057
Naomi and Eli just behind the port-side hull.
lw38_build_02
Mast bulkhead in place.
lw38_build_01
Mast bulkhead and flooring modules being installed.